Tuesday, 5 September 2017

Carry On Painting

Last night, I painted the cobblestones with burnt umber. I used this dark colour for the dirt that gets between the stones. I didn't grab a photo last night as my phone ran out of charge. The image below is from after I started work today.


Today, I dry brushed raw sienna over the top of the burnt umber for the brighter almost polished from use tops of the cobblestones.

Next I glued in warehouse in place.


Compare this with my last post.

The edge needs to be painted with a grey for concrete. A couple of other spots, where there was bleeding under the masking tape, needs some touching up.

Here's a longer view along the water.


There needs some tidying up. The green paint for the water needs a wash. The walls need a touch up as well, then I can work on the bollards - or whatever the wooden piles are that the ships rub against.

It is amazing how much better it looks now.

I think I might be hard pressed doing anything tomorrow night but I reckon that I might be able to squeeze something in. However, I have ticked off another two things on my list from Sunday night.

Until next time.

2 comments:

  1. Nice work Tom, I look forward to following your layout's progress in AMRM.

    ReplyDelete
  2. Thanks Phillip, I hope other readers are enjoying it too.

    ReplyDelete