Now the main platform is complete it can now be ballasted too. The plywood in the distance is awaiting Das cobblestones.
Sunday, 23 October 2016
More Ballast
The heading sums up the work today. I thought that I could ballast all the points but one was being a bit tricky. I tamp the ballast down with an old paint brush and carefully glue the ballast down. I change the points to check that it is all going well. It did for most but one jammed. I spent a bit of time on that point trying to free it up. Eventually I did but I called it quits after that. It will give me something to do tomorrow.
Saturday, 22 October 2016
Saturday is train day.
My apologies to ripping off Chris Lyons' tag line from his YouTube channel. (He says, "everyday is Train Day.")
I spent the day at a local public school fete with a model railway display. I took along a couple of kits to build and paint. The station building took a lot longer than I thought. Not having instructions didn't help. After I finished putting it together, I worked on the platform. I covered it with Scalescenes tarmac and brick to match the loading dock that I had covered earlier.
Thursday, 20 October 2016
Rinse and Repeat
More ballasting...
...and more cobblestones.
This shows the blending of the first lot of cobblestones from Saturday with this evening's effort. I hope it works well or I'm going to have problems.
Last night's ballasting is dry and looks it.
The great thing about matte Mod Podge is that when it dries it doesn't make the ballast look shiny or wet as PVA does.
I'm busy tomorrow night but Saturday should bring some kit building time. I'm hoping to finish the station and the station building. At some stage I should paint the frames of the base board.
Until next time.
Wednesday, 19 October 2016
Bombo's Finest
Yesterday I was able to pop into Hobbyland in Hornsby to check out what ballast they have and picked up a couple of bags of Bombo ballast. My mate's father in law used to work there. The colour is a real dirty brown and just perfect for old dirty ballast that you would find on old branch lines and sidings if they were ballasted. They had a really fine grade which was even better.
Tonight in my fifteen minutes ( more like half an hour), I ballasted a short section of track.
The point took the longest as I needed to make sure that I didn't get grit or glue in the wrong places like my last ballasting effort. For the glue I used a 1:3 ratio mix of Mod Podge Matte to water with a couple of drops of detergent and applied it with a 6 mL medicine syringe from the local chemist, except with the ballast inbetween the point blades. Here I used the handle of a fine paint brush. I dipped it into the glue and touched the ballast. As the glue is "wet", it runs freely off the brush and through the ballast.
I have ordered some static grass so it will be able to fill in the ply bits soon. I probably should spend fifteen minutes soon testing my static grass applicator.
Tomorrow night I will put down more ballast and Das clay on the wharf front.
Until then.
Sunday, 16 October 2016
A Second of My Life
It's been a week of my fifteen minutes a day on the layout challenge.
One thing that I have learnt is that 15 minutes isn't long but it can grow to more time sometimes. Everything seems to take longer than I think it will. Having goals for the next day is a good idea. Planning two or three days a head can be efficient but sometimes tasks are put on hold to get more stuff.
And, when stamping out cobblestones, each on is a second of my life. I'm hoping that I still have more seconds than I need.
I still have plenty to stamp out. I got this idea from Model Rail's Chris Nevard. I coated the plywood with PVA and put Das modelling clay on top. I then use some brass square tubing to pressing the stones. It was used to good effect on Nevard's Brew House Quay.
The local climate wasn't conducive to airbrushing outside on Saturday so I worked on the station building instead.
This is now ready for assembly this week.
I would have posted this yesterday but the Blogger app keeps crashing on my phone.
Today's work was to airbrush the stairs and jetties and fish and chip kiosk. I also painted the pontoon for the passenger ferry and some balsa for the bollards or piles (those poles which stop boats from hitting the pier walls). I painted the kiosk white on the inside and outside. I'd like to put some lights and interior in eventually.
I finished the evening with painting exposed areas of the ply with a mix of student acrylic raw sienna and burnt umber. This will create a base colour for when the grass is put down. I'm not sure as to whether I put some light ballast between the tracks or use more Das to give the impression of a light branch where the track has sunk into the ground. However, here is the section that I've been working on.
I think the jetties and pontoon might need a bit of weathering down to lighten up the timber. I've used a spare jetty to create a loading platform for the dairy.
This week is pretty busy. I won't have any time tomorrow and Tuesday could be a bit tight. I'm hoping to keep going with some more cobblestones.
Until next time.
Thursday, 13 October 2016
Fish and Chips
This evening's effort was fairly quick but a bit more than 15 minutes. I put some steps on the jetties and built the fish and chip kiosk. Everything built this week will need some paint. I reckon the steps from the platform can be white, the jetties can be weathered black and the kiosk can be a light blue.
Tomorrow nights staff dinner is going to cut into things but I'm hoping Saturday morning can make up for it.
Wednesday, 12 October 2016
Jetties
I need add some steps from the tarmac to the jetties but ran out of time today. I can airbrush these on Saturday morning.